Traffic Map
Incidents

Accident in Tucson on N Thornydale Rd at W Overton Rd

56+ MPH

Construction

Broadway Blvd Both EB/WB from Camino Seco to Houghton Rd

Road construction in Tucson on Broadway Blvd Both EB/WB from Camino Seco to Houghton Rd

Broadway Blvd WB from Euclid Ave to 4Th Ave

Road construction, right lane closed in Tucson on Broadway Blvd WB from Euclid Ave to 4th Ave as reported by n/a

Campbell Ave Both NB/SB between Speedway Blvd and Grant Rd

Road construction in Pima on Campbell Ave Both NB/SB between Speedway Blvd and Grant Rd as reported by dot

Cortaro Farms Rd between Camino De Oeste and N Thornydale Rd

Road construction-reduced speed in Tucson on Cortaro Farms Rd between Camino de Oeste and N Thornydale Rd as reported by dot

Grant Rd Both EB/WB between Stone Ave and before Mountain Ave

Long-term road construction in Tucson on Grant Rd Both EB/WB between Stone Ave and before Mountain Ave as reported by dot

I - 10 WB at Orange Grove Rd ( Exit 250 )

Off-ramp closed in Pima on I - 10 WB at Orange Grove Rd ( Exit 250 ) as reported by dot

Ina Rd Both EB/WB at I 10

Ramps closed in Tucson on Ina Rd Both EB/WB at I 10 as reported by dot

Ina Rd Both EB/WB at I 10

Closed due to road construction in Tucson on Ina Rd Both EB/WB at I 10 as reported by dot

Tangerine Rd Both EB/WB between I 10 and Twin Peaks Rd/Dove Mountain Blvd

Paving operations, single line traffic-alternate direction in Tucson on Tangerine Rd Both EB/WB between I 10 and Twin Peaks Rd/Dove Mountain Blvd

Tangerine Rd Both EB/WB between Thornydale Rd and La Cholla Blvd

Road construction in Tucson on Tangerine Rd Both EB/WB between Thornydale Rd and La Cholla Blvd

Tangerine Rd EB between La Cholla Blvd and La Canada Dr

New road construction layout in Tucson on Tangerine Rd EB between La Cholla Blvd and La Canada Dr